![]() It provides moderate resistance to force attacks (including those using portable cutting tools) and very good detection of such attacks (when approved vibration detection equipment is installed as recommended). The wall design in this Guide is a tested and recommended light weight construction to adequately mitigate the design-basis threat against typical government offices in standard urban settings. Having a name, abbreviation, definition and guide number specifically for a Secure Demising Wall (SDW) also makes it easier to reference source material without confusion. ![]() This guide was developed specifically for the construction of a secure demising wall and to help avoid inappropriate use of the Secure Storage Room Guide (see note 1). Security requirements should be incorporated into contract documents where feasible to ensure enforceability.įor many years, various departments have been using portions of the construction specifications from the G1-029 Secure Room Guide 1 to construct walls around departmental space (e.g., in office towers), working spaces, operations rooms, High Security Zones, etc. Sub-trades should receive only enough information to perform their work (eg: partial building drawings and system schematics which do not identify adjacent activities or security-related system details). A generic or numeric name should be used. For example, the purpose or name of the room should not appear on widely disseminated drawings, specifications or other contract documents. The architect or designer should be provided with formal guidance / direction on the preparation of drawings for tender or sub-trades to ensure that sensitive information is not inappropriately divulged. Segregation of details and distribution on a need-to-know basis will often be sufficient. They may require a security clearance to receive this information. The rationale for any component or feature (as well as the purpose of a space or nature of the asset) should only be divulged to architects, designers or contractors on a need-to-know basis. Qualified architects or designers should be engaged to turn the SOR into detailed drawings and specifications – incorporating all client-specified features and components and ensuring that the design conforms to overall project requirements and all applicable codes and facility “fit-up” standards. This Guide is intended to assist qualified security practitioners and departmental physical security staff to develop a Statement of Requirements (SOR) for the construction of a Secure Demising Wall (SDW). ![]() Top of Page PART 1 (For use by the Department or Agency) How to Use This Guide Open shelf storage includes storage where records are kept in containers or commercial fire and/or water resistant containers. ![]() Open Shelf Storage - Storage other than in approved security containers and safes. The SOR should be developed from the advisory information in Part I of this Guide, along with specialist advice as required. Statement of Requirements - The client-generated list of project-specific requirements (especially selection of optional alternatives) for the SDW. Secure Working Room - A specially designed room, suite of rooms or spaces used for the processing and open shelf storage of classified information. Secure Demising Wall - A force-resistant wall constructed according to RCMP Guide G13-02. For Canadian Forces Bases the Authority Having Jurisdiction will be the Canadian Forces Fire Marshall.Īttack Side - The side of the door or wall that is exposed to the adversary.īase-line Threat - Threats common to government departments in Canada, under normal security conditions, as defined in the Operational Security Standard on Physical Security.ĭesigner - A qualified person (architect, engineer, technologist or other) tasked to develop the specific project design (drawings and specifications) based on the client-generated Statement of Requirements (SOR) and conforming to the overall project and code requirements. Figure 9: Surface Mount Duct Pass-ThroughĪuthority Having Jurisdiction - Normally the local city, municipality or county building inspector.Figure 8: Ceiling Mount Duct Pass-Through.Figure 6: Critical Attack Area Wall Reinforcement.Figure 5: Example of Mesh Interlay Seam, Riveted.PART 2 (SDW Construction Specifications).PART 1 (For use by the Department or Agency).
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |